Developments
Urban East
Located at 6400 East Riverside Drive, between Montopolis Dr. and Vargas Rd., the 7.3-acre Urban East project, designed by Davies Collaborative, will include 381 units in the first phase, with an expected delivery date of Q1 of 2023. The second phase, estimated to begin in Q1 of 2022, will bring an additional 138 units for a total of 518 units. Approximately 80 percent of the apartments will be one-bedroom units, with an average size ranging from 750 to 800 square feet, as well as efficiency studios at approximately 550 square feet and the largest units spanning over 1,200 square feet. The site also will feature three structured parking garages.
6610 East Riverside
6610 East Riverside Drive, adjacent to our ongoing Urban East development, is a 6.5 acre tract located in the fast-growing Riverside submarket in Austin, TX. Fully built out, the project will consist of approximately 700 residential units (delivered in two phases), with first-class amenities, nearly an acre of open green space, and up to 4,500 square feet of retail space for rent.
Parmer Gateway
Located at 4801 East Yager Lane, Parmer Gateway is a 70-acre opportunity zone mixed-use development on E. Parmer Lane, adjacent to the Samsung Semiconductor campus, that will feature multi-family, hotel, retail and rental housing.
The projects is located at the intersection of East Yager Lane and East Parmer Lane in the bustling Tech Ridge Corridor, which is also home to major companies including Apple, Facebook, 3M, The Home Depot, General Motors and Allergan.
SE Austin Residential Development
South East Austin Residential Community: 2,300 single and multifamily units, 40,000+ square feet of retail, 22 acres of parks and recreational facilities
Wright Road Industrial
The site is logistically attractive to prospective buyers given its high-growth potential and close proximity to Texas 45 Freeway which connects in 5 minutes to I-35, 20minutes to Austin Bergstrom Airport, and 25 minutes to both downtown Austin and the new Tesla Gigafactory. Projected hold time continues on track with 2 lots sold.
Wright Rd Industrial: 55 acres